Energy Efficiency

We measure where and how much your plant consumes, then bring the bill down with power factor correction and drive applications.

Measure, see, reduce

  • Measurement report
  • Improvement list
  • Investment and payback table
Method

Efficiency work begins with measurement: analysers on the main incomer and critical feeders reveal load profile, power factor and harmonic level. Where there is a risk of reactive penalties we size a correction panel; where distortion is high we recommend detuned reactors. Loads suitable for drives are identified, payback is calculated and investment is prioritised.

Scope

  • Energy measurement and analysis
  • Power factor and harmonic assessment
  • Correction panel sizing
  • Identifying drive opportunities
  • Payback calculation

Deliverables

  • Measurement report
  • Improvement list
  • Investment and payback table
When is it needed?

Does this apply to you?

If even one of these sounds familiar, it is worth a conversation. In the survey we first measure the current state together.

  • The bill shows a reactive power penalty.
  • Capacitors in the correction panel fail frequently.
  • Nobody knows how much each feeder in the plant consumes.
  • The number of drives has grown but harmonic levels have never been measured.
Process

How we run this kind of project

  1. 01

    Measurement and data collection

    Analysers are installed on the incomer and critical feeders, recording load profile, power factor and harmonic levels over a defined period.

  2. 02

    Analysis and diagnosis

    Penalty risk, insufficient correction and harmonic distortion are assessed separately. The root of most capacitor failures becomes visible at this stage.

  3. 03

    Sizing the correction

    The required number of steps and their power are determined; where distortion is high, a detuned solution is recommended.

  4. 04

    Identifying drive opportunities

    Variable-flow loads are listed, the estimated gain and payback are calculated, and investment is prioritised.

  5. 05

    Implementation and verification

    Improvements are implemented and measurement is repeated under the same conditions. The gain is documented with a before/after comparison.

Outcomes

We measure what changed when the project ends

Reactive penalty
Correctly sized power factor correction can remove the penalty line entirely.
Capacitor life
Detuned reactors reduce harmonic-related failures.
Visibility
Consumption per feeder becomes measurable, so investment decisions rest on data.
Frequently asked questions

Frequently asked about Energy Efficiency

How long does measurement take, and does it stop production?

Connecting the analyser may need a brief interruption, and in some cases clamp-on measurement avoids it entirely. For a meaningful load profile, measurement usually runs for several days to cover a full production cycle.

I have a correction panel but still get penalised — why?

The most common causes are failed steps, welded contactors, an incorrectly set controller, and capacitors losing capacitance because of harmonics. Only measurement separates which one applies.

Contact

Have a project or a material list?

Send us your list; we return stock status, lead time and wholesale pricing the same day.

Sales line

+90 232 433 66 69+90 532 062 67 19info@vektorenerji.com.tr

Monday – Friday · 08:30 – 18:30

CallWhatsAppDirections