Work we have completed on site
From machine vision systems built into factory lines to overhead power line and fibre infrastructure work — the projects we have delivered, told with our own photographs.
- 11
- Published projects
- 2
- Field of work
Machine vision and quality control
06 Published projects
01Bir dondurma üreticisi2026
AI-assisted carton inspection line
Carton inspection at line speed with an Omron FHV7 AI camera
Cartons leaving the ice cream production line are inspected in real time with an Omron FHV7 smart camera and AI-assisted image processing; defective cartons are rejected before palletising.
- Omron FHV7 AI
- AI image processing
- Reject synchronisation
02Bir dondurma üreticisi2026
Date code verification with OCR
Reading and verifying date codes on the line
At an ice cream plant in Konya, expiry dates on packaging are read on the line with OCR technology, and faulty or unreadable prints are removed before shipment.
- OCR image processing
- In-line camera
- OK/NG operator screen
03Bir profil üreticisi2026
Profile surface inspection on the extrusion line
Surface and dimensional checks without stopping the flow
Real-time surface and dimensional inspection with an Omron FHV7 smart camera on the extrusion line for door and window trims; faulty profiles are identified while still on the line.
- Omron FHV7
- Dimensional inspection
- In-line HMI
04Bir plastik enjeksiyon üreticisi2025
Plastic crate and grid inspection on the injection line
Detecting short shots and excess material with a Leuze IVS camera
Plastic crates and grids leaving the injection machine are inspected with a Leuze IVS camera; short shots, excess material, broken feet and cell-count errors are caught on the line.
- Leuze IVS
- Template matching
- Area analysis
05Bir yapı elemanı üreticisi2026
Four-camera line inspection in moulding production
Omron FH series cameras at line entry and exit
Four Omron FH series cameras placed at the entry and exit of the moulding line catch surface defects in real time and keep quality consistent.
- Omron FH series
- Four-camera setup
- Surface defect detection
06Bir metal ambalaj üreticisi2024
Colour and surface inspection on tin packaging
Detecting deviation in base and body colour
The base and body colour of tins leaving the production line are inspected instantly with image processing, so colour deviations and surface defects are identified on the line.
- Colour analysis
- Surface inspection
- In-line camera
Power and infrastructure
05 Published projects
072024
Urla Özbek medium-voltage transmission line
Design and commissioning of a 34.5 kV overhead and underground line
Design, installation and commissioning of a 34.5 kV medium-voltage transmission line in the Urla Özbek area, combining overhead and underground sections.
- 34.5 kV overhead line
- Pole and cross-arm mounting
- MV cubicle and transformer connection
08Bir havalimanı işletmesi2024
Fibre optic infrastructure on an airport site
A 12-core fibre backbone for air traffic and operations systems
A 12-core fibre optic backbone built for air traffic control and operations systems at an airport in Samsun, completed on night shifts without interrupting operations.
- 12-core single-mode fibre
- Splicing and OTDR measurement
- Manholes, ducting and tray
092024
Compact kiosk transformer and generator installation
A 1250 kVA compact kiosk and an 800 kVA diesel generator
Turnkey installation of a 1250 kVA compact kiosk transformer and an 800 kVA diesel generator at an industrial plant, together with MV-LV cabling, an ATS panel and the earthing system.
- 1250 kVA compact kiosk
- 800 kVA diesel generator
- ATS panel and earthing
10Bir kamu kurumu2023–2024
Distribution centre and transformer works at a public facility
A TEDAŞ-approved, turnkey distribution centre
Construction of a distribution centre for a public institution facility, supply and installation of medium-voltage cubicles, third-party transformer connections, plus TEDAŞ project approval and official procedures.
- Medium-voltage cubicles
- Third-party transformer connection
- TEDAŞ project approval
112024
Cable pulling for power and communications infrastructure
Trenching, ducting and cable pulling in one scope
Trench excavation, HDPE and PVC ducting, MV-LV and data cable pulling and termination for power and communications infrastructure on industrial and commercial sites.
- HDPE and PVC ducting
- MV-LV and data cable
- Joints and termination
Have a project or a material list?
Send us your list; we return stock status, lead time and wholesale pricing the same day.